Guiyang Urban Rail Transit
<p><strong>Guiyang Urban Rail Transit</strong></p>
<p> </p>
<p>Guiyang Urban Rail Transit is a short railway line that started operations in December 2018. It only has 1 line but more lines are in planning for being opened.</p>
<p> </p>
<p><strong>Cost</strong></p>
<p> </p>
<p>Cost is determined by distance. The breakdown is on the table below:</p>
<p> </p>
<table width="624">
<tbody>
<tr>
<td>
<p>Distance</p>
</td>
<td>
<p>Price</p>
</td>
</tr>
<tr>
<td>
<p>4km</p>
</td>
<td>
<p>CNY2</p>
</td>
</tr>
<tr>
<td>
<p>4km to 8km</p>
</td>
<td>
<p>CNY3</p>
</td>
</tr>
<tr>
<td>
<p>8km to 12km</p>
</td>
<td>
<p>CNY4</p>
</td>
</tr>
<tr>
<td>
<p>12km to 18km</p>
</td>
<td>
<p>CNY5</p>
</td>
</tr>
<tr>
<td>
<p>18km to 24km</p>
</td>
<td>
<p>CNY6</p>
</td>
</tr>
<tr>
<td>
<p>Over 24km</p>
</td>
<td>
<p>Additional CNY1 for every 8km</p>
</td>
</tr>
</tbody>
</table>
<p> </p>
<p><strong>Operating Hours</strong></p>
<p> </p>
<p>This line is open from 6:30 am to 10:30 pm.</p>
<p> </p>
<p><strong>How/Where to Buy Tickets</strong></p>
<p> </p>
<p>Single journey tickets can be bought at the station itself. Alternatively, you can buy a Guiyang Smart Prepaid Card.</p>
<p> </p>
<p><strong>Connections to Train Stations/Airports</strong></p>
<p> </p>
<p>Line 1 has 10 stations that run through Xiamaixi to North Railway Station</p>
<p> </p>
<p><strong>Major Tourist Landmarks of the City Near Stations</strong></p>
<p> </p>
<p>-International Eco Conference Center at International Eco Conference Center Station</p>
<p>-Yuehutai Art Gallery at Yuehuanshu Station</p>
<p> </p>
<p> </p>
<p><strong>Other Major Stations to Note</strong></p>
<p>-International Eco Conference Center station connects to the Airport Shuttle Bus Jinyang Line</p>
<p>-Guanshanshu Park station connects to Airport Shuttle Bus Jinyang Line</p>
<p>-North Railway Station connects to Airport Shuttle Bus Jinyang Line</p>
<p> </p>
<p><strong>Future Development Plans</strong></p>
<p> </p>
<p>The railway is set to have Lines 2 opened in 2020 and Line 3 in 2022. Line 4 is also in the works but no details have been disclosed yet.</p>
<p> </p>
<p><strong>Additional Information</strong></p>
<p>There would be a total of 9 lines in this transit that would extend with a total distance of 467 KM.</p>