Wenzhou Rail Transit
<p><strong>Wenzhou Rail Transit</strong></p>
<p>Wenzhou Rail Transit is the brand new metro system of Wenzhou City in the Chinese province of Zhejiang. It started its trial operation in January 2019 with one line called S1, and only its west section is being used. Therefore, this metro system isn’t officially open yet. Here’s more information about Wenzhou Rail Transit:</p>
<p><strong>Cost</strong></p>
<p>No official information regarding the ticket prices were released yet. However, the prices may vary according to travel distances, and it’s expected to be around CNY2-CNY9.</p>
<p><strong>Operating Hours</strong></p>
<p>Wenzhou Rail Transit’s operating hours:</p>
<table>
<tbody>
<tr>
<td width="319">
<p><strong>Line</strong></p>
</td>
<td width="319">
<p><strong>Operating Hours </strong></p>
</td>
</tr>
<tr>
<td width="319">
<p>S1</p>
</td>
<td width="319">
<p>6:30am-8:00pm</p>
</td>
</tr>
</tbody>
</table>
<p> <strong> </strong></p>
<p><strong>How and Where to Buy Tickets </strong></p>
<p>Tickets will be available on self-service ticket vending machines and ticket windows in every station.</p>
<p><strong>Connections to Train Stations</strong></p>
<p>Train stations connected with Wenzhou Rail Transit:</p>
<p><strong>S1: </strong>The west section of S1 is 34.4km long, covering 12 stations including the South Railway Station. Its run starts at Tongling and ends at the Olympic Center and vice-versa. </p>
<p><strong>Major Tourist Landmarks of the City Near Stations</strong></p>
<p>Popular landmarks in the city nearby stations:</p>
<p><strong>S1: </strong>You can visit the Wenzhou Olympic Sports Center and take photos of its amazing architectural designs, especially the football stadium. </p>
<p><strong>Other Major Stations of Note </strong></p>
<p>Major Stations connected with Wenzhou Rail Transit:</p>
<p><strong>-Panqiao</strong> – Line terminal</p>
<p><strong>-Sanyang Wetland </strong>– Line terminal</p>
<p><strong>Future Development Plans</strong></p>
<p>The remaining sections of Line S1 and the entirety of Line S2 and S3 are still under construction. Moreover, Line S4, M1, and M2 were proposed but have not received approval yet.</p>
<p><strong>Additional Information</strong></p>
<p>Line S1 is color-coded with Blue for quick identification. </p>